Skip to content

January 5, 2009

Updates

Hi all.  I have been busy through the holidays both with model railroad and issues not related to railroading and model railroading.  What I have done is manage to get the test track under way.  I am about 80 percent completed with it.  I will have a new programming track, a DCC and a DC test track.  Basically it is two tracks that are 10 feet long.  The tracks are straight with no turnouts.  I am also working on putting in a  speedometer so I can balance out locomotive consists.  I will have more later.      A.J.

Share your thoughts, post a comment.

(required)
(required)

Note: HTML is allowed. Your email address will never be published.

Subscribe to comments