Updates
Hi all. I have been busy through the holidays both with model railroad and issues not related to railroading and model railroading. What I have done is manage to get the test track under way. I am about 80 percent completed with it. I will have a new programming track, a DCC and a DC test track. Basically it is two tracks that are 10 feet long. The tracks are straight with no turnouts. I am also working on putting in a speedometer so I can balance out locomotive consists. I will have more later. A.J.
More Railfan and MRR Pictures Added
I have slowly been going through and organizing the pictures I have taken over the years. So I have added a lot more pictures to the New England Trains Gallery. Some photos are as recent as August of 2008. Others go back to the mid 90’s or earlier.
I also wanted to show some progress of my model railroad. I have been building the New River Mine by Walthers. I have been taking my time with it. Sometimes I may only get a piece or too glued a night, but there is progress. Anyway there are some shots of this progress in the Model Railroad Gallery. You will see two interior shots of the New River Mine.
A.J.

